MESSIER-DOWTY

Industrial, Mirabel

2010 – Miscellaneous works
2009 – Building expansion and pits for dipping basins
2008 – Foundations and bases for two new machines
2006 – Base for washing machine
2005 – Foundations on piles and bases for Butler and Droop & Rein machines
2004 – Interior fit-ups in the facility
2003 – Climatisation of the entire building (100,000 square feet)
2002 – Foundations on piles and bases for three Droop & Rein machines
2000 – Foundations on piles and bases for a SAFOP machine
1999 – Double the capacity of the electricity entrance
1998 – New mezzanine for offices. Base on piles for a PAMA machine
1997 – 10,000 square feet building expansion for machine shop with travelling crane
1997 – Base on piles and installation of a 5-axes machine CNC Toshiba